
Envision Energy and German clean energy developer ju:niz Energy have announced their latest collaboration, securing the 442MWh grid-scale energy storage project Smareg 13 (Vöhringen II) in Bavaria. This marks the third energy storage project delivered jointly by the two parties, bringing their combined portfolio to nearly 600 MWh and further expanding Envision Energy’s footprint in Germany’s energy storage market.
Located in Bavaria, the Smareg 13 site sits next to the already operational Smareg 12 storage station, forming part of ju:niz Energy’s utility-scale energy storage asset portfolio. ju:niz Energy will oversee project development, financing and long-term operation after commissioning, while Envision Energy supplies its 8th-generation energy storage system platform. Designed for a four-hour discharge duration and equipped with grid-forming capability, the system will deliver critical grid stabilisation services including frequency regulation and voltage support, serving as a key flexibility asset for integrating renewables and smoothing power fluctuations across southern Germany.
As one of Europe’s core energy storage markets, Germany has seen rapid growth in wind and solar installations in recent years, driving rising demand for flexible grid resources. Bavaria boasts abundant wind and solar resources yet faces constrained grid infrastructure. Standalone energy storage plants offer a cost-effective route to boost grid flexibility.
Grid-forming storage is proving especially valuable in weak grids with high penetration of renewable power. It has increasingly become a preferred requirement in international grid-scale storage tenders. The platform supplied by Envision Energy features native grid-forming functionality, well aligned with the upgrade needs of Germany’s power network.